The 'greenneedle' bathroom
Page [1] [2] [3] [4] [5] [6] [7] [8] [9]
18th August 2010
I have got the hang of this now. The joints may not be perfectly equal and some of them are larger than others but over the 4 hour timeframe here I did the whole of the back wall, the shelf and trim, and got half way up the side walls.
Its starting to look quite cool.
![]()
![]()
![]()
![]()
![]()
![]()
![]()
19th August 2010
The final tiles went up and then after 3 hours the lot was grouted, cleaned and then polished.
Even my wife made a nice commetn and that is a first. I love it. Super cool and modern I think. Just a few little details and touch ups required here and there to complete the first stage
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
21st August 2010
The Stage 1 is complete. A couple of finishing touches are the old telescopic shower rail. This will have to suffice until next month when I get a chrome U shaped one. the old mixer/shower tap has been returned and I have mounted the shower to the wall lower down. It will eventually be a 'rinser' and I don't want to drill holes to fit the riser bar when it won't be there at the end.
The shower curtain was cheap from Poundland and will suffice until we find one that suits the decor.
![]()
![]()
![]()
![]()
Page [1] [2] [3] [4] [5] [6] [7] [8] [9]