The 'greenneedle' bathroom
Page [1] [2] [3] [4] [5] [6] [7] [8] [9]
3rd September 2010
The work that had been planned for this month had to be left. With the start of school, new uniforms etc. the budget just wouldn't stretch to doing any more tiling.or buying the thermo rain shower items.
However always one for compromise I bought a coupler (male to male) for a couple of quid to link 2 shower hoses together and a couple of metal fluorescent tube clips to hold the existing 'microphone' style shower head and we have a temporary ceiling shower.
Also at zero cost as the old broken camera and accessories sold for £23 on ebay I bought a U shaped shower rail for £14.99 off ebay. Stainless steel not chromed plastic.
It needed about a foot cutting off the side rails so that it was level with the bath and the ceiling mounts the same. I may well cut another 4" off the side rails as this is the gap between curtain and wall on both sides when it is fully stretched out.
Next month will similarly be delayed because car tax is due and Christmas approaching fast, although I do hope to complete the walls by Christmas.
![]()
![]()
![]()
![]()
![]()
![]()
Page [1] [2] [3] [4] [5] [6] [7] [8] [9]


.gif)



